Saturday, July 28, 2012

Ice Table WIP #2

 
 
I managed to do more work on the ice table.  I attached the foam to the plywood and put a base coat of light blue paint on the whole thing.  Also picked up the rest of the materials for the third board section, as I didn't have enough of the 1.5" foam to do the board.  Also you can see the test fitting of some of the details that are going to be added.  For the third section I'm considering narrowing the river down and maybe building some sort of bridge over it.  Though I want to be able to stack these boards on each other, so most detail needs to be removable.  Also I need to figure out what to do for the pumping station in the middle of the river. 